ParcelBench
Quality control

Packaging lot trace coverage

Check whether packaging lot trace is complete enough to isolate an incoming quality issue.

Calculator inputs

Orders with confirmed lot trace

93.829787

%

The example result is shown.

Worked example

Orders linked to confirmed material lot 882 ordersOrders using tracked materials 940 orders

Orders with confirmed lot trace 93.829787 %

Calculation

100 × a ÷ b

a
Orders linked to confirmed material lot · orders
b
Orders using tracked materials · orders