Packaging costs
Monetize minutes saved each shift
Translate shorter packing cycles into capacity value across recurring shifts.
Monthly labor capacity value
currency
The example result is shown.
Worked example
Minutes saved per shift 52 minOperating shifts per month 23 shiftsLoaded labor rate 20.5 currency/hour
Monthly labor capacity value 408.633333 currency
Calculation
a × b × c ÷ 60
- a
- Minutes saved per shift · min
- b
- Operating shifts per month · shifts
- c
- Loaded labor rate · currency/hour