Packaging costs
Packing labor per order
Value a measured pack cycle in labor terms to compare closure methods or stations.
Direct labor cost per order
currency/order
The example result is shown.
Worked example
Handling time 74 seconds/orderLoaded labor cost 22 currency/hour
Direct labor cost per order 0.452222 currency/order
Calculation
a × b ÷ 3600
- a
- Handling time · seconds/order
- b
- Loaded labor cost · currency/hour